Prepare the Room for New Fittings
The installation plan covers access, protection and removal of the old bathroom. Exposed walls, floors and pipes are checked before they are covered again. Any extra repair work should be explained and priced before it proceeds.
- Agree access and waste removal
- Check walls, floors and connections
- Confirm time without a toilet, water or shower

Fit the Bathroom in the Right Order
Plumbing, electrical work and support for fittings need coordinating with the walls and floor. The bath or shower, basin, toilet and furniture are installed to the agreed layout. Drying and setting times depend on the products used.
Check Operation and Explain Care
Final checks cover the agreed fittings and finish. Ask for controls to be demonstrated and maintenance access to be shown. Keep the product instructions, warranty details and any relevant records for electrical or other specialist work.

Your Bathroom Questions
How long will fitting take?
The time depends on the room, preparation, products and any hidden damage. Agree a schedule after the survey, including when the bathroom can return to normal use.
What if damage is found under the tiles?
Have the problem explained and any extra repair priced before it goes ahead. Covering damaged surfaces without dealing with the cause can create further problems.
Does installation include electrical work?
The required electrical work should be listed in the quote and carried out by a suitably qualified electrician. Confirm the lighting, fan, shower and powered fittings before work begins.